Områder
5 hectares site. Expansion option to 10 hectares in total.
Immediate access to 12 MW of power.
Optical/dark fibre is available.
The site can be adjusted to suit customer needs. The site is owned and administrated by the local municipality - Suldal
For more information about this site, please contact us.
| Area name | Tysingvatn |
| Ready to start building construction within months | 12 |
| Hectars available at plot | 5 |
| Square meters available at plot | 48 000 |
| Plot expansion (m2) | 50 000 |
| Region | The Stavanger region |
| Municipality | Suldal |
| Location coordinates | 59°23'53.8908"N 6°9'15.696"E |
| Yearly avg air temperature | 7 |
| Ready to start building construction within months | 12 |
| Plot procurement status | available |
| Power available now (MW) | 12 |
| Power available in 12 months (MW) | 12 |
| Power available in 24 months (MW) | 12 |
| Power available in 36 months (MW) | 24 |
| Latency to Dublin (ms) | 15 |
| Latency to London (ms) | 10 |
| Latency to New York (ms) | 42 |
| Latency to Frankfurt (ms) | 13 |
| Latency to Amsterdam (ms) | 12 |
| Latency to Stockholm (ms) | 11 |
| Latency to Oslo (ms) | 6 |
| Latency to Esbjerg (ms) | 9 |
| Latency to Newcastle (ms) | 9 |
| Dark fibre available | yes |
| Fiber distance to | 100 |
| Fibre connection available at plot | no |
| Airport international flights | Avinor link |
| Distance international airport (km) | 119 |
| Distance to industry harbor (km) | 6 |
| Distance to university (km) | 114 |